Schedule |Wishlist| Technical Specification | Trade off | Hindsight |Software |Fun|

9/25
Finite State Diagrams for the flying vehicle, test model and track due
9/26
Pictures, Game spec Website, soundfiles
9/30
*Assignment 3 due. *Working Website Deadline. Basic Vehicle Model and animations. Test Code for Chautauqua Is Due.
9/31
Last Day Andrew is in town till Sunday Test, Test Code to trigger animations due. Test Track is Due.
10/2
Start/End race code due. Vechicle Stats is Due.
10/7
*Chautauqua Presentation Write up. finish user interface code.
10/8
*Install/Test Chautauqua Demo in EVL, *Chautauqua documentation on webpage.
10/9
*Chautauqua Due
10/14
finish basic race course design, Speed/directions Calculations due.
10/16
add models and texture maps
10/21
*Finish prototype webpage
10/23
*CODE FREEZE
10/27
*TEST DEMOS in EVL
10/28
*PROTOTYPE DUE
10/31
2-D COLLISION working!
11/4
11-4 Documents Posted on Webpage. Progress Report Documentation Posted on Webpage.
11/16
3-D Collision Control, Acceleration, Deceleration, Turning Speeds. AI Documentation and Finite State Diagram, Collision “Animations”, Texture Maps.
11/11
11-11 Car data read from file, AI- Init Function, Preset Path Data, AI-
Documentation on Website.
11/18
11-18 2 More Cars, One Track (Same) with Obstacles, AI –Driving around Track alone, Heads Up Display, Rear View Camera, Cockpit View Point
11/24
11-24 AI Driving With User Competitively on blank Track.
11/26
Final AI tweaks, and Test (preliminary) on Obstacle Track.
11/27
Happy Thanksgiving
12/1
Smart AI, with Obstacles
12/2
12-2 Code Freeze, Final Screen shots
12/3
Test Demos in EVL, Website Final presentation Documentation
12/4
Final Presentation, Website, Documentation DUE
 

Note: A lot of this in regards to the type of code due on which day is rather flexible, because I am anticipating delays. However, there should atleast be a basis of the code by this date at the latest. The Things that are ABSOLUTELY
NOT FLEXIBLE are Shown with an *. Schedule